Assembly Line

S2000 Enveloper

S2000 capacity 130 Env./min.
Plate types: Cast grids, Expanded metal, Concast or Punched.
Plate width 100-150 mm
Plate height 100-150 mm
Plate thickness 1-2 mm

S85 & M85 Enveloper

S85 & M85 capacity 80-90 Env./min.
Plate types: Cast grids, Expanded metal, Concast or Punched.
Plate width 102-152mm
Plate height 102mm-152mm
Sealing margin 7mm (.28”) per side/minimum.

HV350 Enveloper

Enveloper HV350 for SLI batteries.
Capacity 150 Env./min.
Plate types: Cast grids, Expanded metal, Concast or Punched.
Plate width: 106-142 mm.
Plate height 90-150 mm.
Plate thickness: 1-2 mm.

COS II-b (For PE, EFB & AGM)

Cycle Time approx. 4.5 batteries/min for PE battery. AGM Battery applicable 3 batteries/min.
Full automatic operation in each station. Battery type Changeover
approx. 20 min

COS III (For Truck)

Cycle Time : approx. 2-2.5 batteries/min.
3×2 battery type (1×6 applicable).
Full automatic operation
Group supplying, loading, lug preparation, alignment, cast-on-strap and unloading. Battery type Changeover
approx. 20 min.

COS II (For PE & EFB)

Cycle Time approx. 4.5 batteries/min. of L3 battery
Automatic operation in each station.
Battery type Changeover approx. 20 minutes
Dust and fume extraction system for working environment.

COS I

Cycle Time approx. 3 Batteries/min. based on L2 battery.
Semi Automatic Operation
Manual Loading/Unloading Station
Auto: Aligning, Lug brushing, Fluxing & Drying and Mould Station. Battery type changeover Approx. 20 minutes.

Post burning machine

Cycle Time approx. 4.7 Batteries/Min. of L3 Battery
Using touch panel for easy operation
Precise control of welding depth in terminal and movement of head up/down.

Partition hole punching machine

Cycle Time approx. 4.7 Batteries/min. of L3 Battery
Easy and quick changeover in the touch panel.
Linear movement for hole punching,
automatic collecting of punched chip by suction into box.

LID sealing machine

Cycle Time approx. 4.7 Batteries/min. of L3 Battery
Better sealing quality of plastic material by speed control of melting and sealing. Easy and quick changeover on touch screen.

Combi machine

Cycle Time approx. 4.7 Batteries/min. of L3 battery.
Reject station included after short circuit tester and Quick changeover by push button on touch screen.

Air leak testing

Cycle Time approx. 4.7 Batteries/min. of L3 Battery
AGM Battery applicable (Option).
Leak tester (2 heads)
Using Fukuda testing unit (Accuracy: 0.00015kg cm2).
MFG. code marking unit.